Skip to content

St Joe Community Foundation Reef 2

Placed on 17 Jul 2020 with joint funding from MBARA and St Joe Community Foundation. 9 Super Reefs, steel reinforced concrete/limestone, 15’H X 15-ft triangular base, 36,000 lbs ea. 9 Ecosystem on Pedestal 5’H X 42″ Dia, 4,000 lbs each. 13 Florida Limestone Artificial Reef mod, steel reinforced concrete, 8’H X 10-ft triangular base, 5,000 lbs ea. 2 Grouper Reefs, steel reinforced concrete/limestone, 5’H X 9’L X 6’W, 7,000 lbs ea. Verified by Bob Cox on 18 Jul 2020.”

Location:
Sherman Site

REEF ID: 257
Latitude: 29° 55.096 N
Longitude: 85° 39.120 W
Range: 11.7 nm
Bearing: 261
Depth: 80 feet

Range and Bearing is taken from mouth of Mexico Beach Canal.

Reef Photos

Reef Videos

Reef Surveys